Skip to content

Re-roofs · Miami Gardens

Roof replacement in Miami Gardens, FL

Miami Gardens counts 37,003 housing units, and the median home was built in 1970. By that measure the housing is older than most of the county. A re-roof here is a permitted job, and the rules set how much of the roof you must replace.

Updated October 2026

Curved concrete arch rises above a wide, empty boulevard with traffic signals and a single distant car.
Drone view of a single-story home mid re-roof: part of the roof stripped to white synthetic underlayment, the rest still in gray shingles, a dump trailer of debris and a pickup in the driveway.Our work
Photo: Miami Gardens FL Sunshine State Arch 03 by Pietro, CC BY-SA 3.0, cropped

Miami Gardens figures this page uses

Share of homes built before 1980
71.8%
Share of homes built 2010 or later
5.8%
Median year homes were built
1970
Housing units (ACS 5-year)
37,003

Housing age

Why older homes make replacement the likely answer

About 71.8 percent of homes here were built before 1980, against 49.6 percent across Miami-Dade County. Only 5.8 percent date from 2010 or later. Many roofs in Andover, Carol City and Norland are likely on their second or third cycle, and some may be overdue.

Age matters for insurance too. Once your roof reaches 15 years, Florida law gives you the right to hire an authorized inspector at your own cost. If that inspector finds 5 or more years of useful life left, your insurer may not drop or refuse you for age alone. Before you pay for an inspection, call your agent and ask how the rule reads against your own Miami Gardens policy.

Permit and inspections

What a Miami Gardens re-roof permit requires

Building Services at the City of Miami Gardens issues your roof permit. Miami-Dade is one of two counties in the High Velocity Hurricane Zone, so the strict South Florida provisions apply. A licensed contractor must complete and sign the uniform roofing permit application, and product approvals and detail drawings go with it.

Your contractor may not lay new roofing over sheathing that is loose or water soaked. Before work begins, the contractor must tell you about any ponding water risk and suggest a structural review if it is likely. Two or more existing layers mean a full tear-off to the deck.

Have a Notice of Commencement recorded and posted at the job before the first inspection, because the code warns that skipping it can leave an owner paying twice. Also watch the clock: under the Florida Building Code a permit lapses if work has not started within 6 months.

Repair or replace

The 25% rule for partial roof repairs

Florida limits repairs to 25 percent of the roof or roof section in any 12-month period. Go beyond that and you replace the entire roof or section. A roof that was itself built, repaired or replaced under the 2007 Florida Building Code or later is exempt, so only the repaired part must meet current code. With a 1970 median build year here, ask your contractor to show which case fits your roof.

Questions

Roof replacement in Miami Gardens: questions

What is the 15 year roof rule in Florida?

Under Florida law, once a roof is 15 years old the insurer must let you have an authorized inspector check it at your own expense before requiring replacement. If the inspection shows 5 or more years of useful life left, the insurer may not refuse or non-renew your policy solely because of the roof's age. A roof under 15 years old is not, by itself, a lawful reason for an insurer to decline to issue or renew your policy. With 71.8 percent of Miami Gardens homes built before 1980, many owners here will face this question. To learn how this affects your own policy, contact your insurer or agent.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: Roof replacement

Who issues a roof permit in Miami Gardens?

City of Miami Gardens Building Services handles roof permits. Because Miami-Dade County sits in the High Velocity Hurricane Zone, the application must be completed and executed by a licensed contractor, with product approval and detail drawings attached. Confirm current forms and fees with the building office before work starts.

Source: City of Miami Gardens - Building Services, read Oct 5, 2026

Related: Roof replacement

Can I replace only part of my roof in Miami Gardens?

Only up to 25 percent of the roof or roof section in any 12-month period. Beyond that, the entire roof or section is replaced. A roof built, repaired or replaced under the 2007 Florida Building Code or later gets relief, so only the new work must meet today's code. Many of the 71.8 percent of homes here built before 1980 likely have older roofs.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: Roof replacement

Does the new code edition affect my permit?

Yes, by filing date. The Ninth (2026) Edition of the Florida Building Code becomes effective December 31, 2026, and any application filed on or after that day follows it. Before that date, filings fall under the Eighth Edition (2023), in force since December 31, 2023. Ask Miami Gardens Building Services which edition governs your filing.

Source: City of Miami Gardens - Building Services, read Oct 5, 2026

Related: Roof replacement

Sources for this page(29)
  1. 1.Share of homes built before 1980: 71.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  2. 2.Share of homes built 2010 or later: 5.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  4. 4.Wikipedia, 'Miami Gardens, Florida' (revision 1374541944). Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Permit office: City of Miami Gardens - Building Services. City of Miami Gardens - Building Services. Read Oct 10, 2026.
  8. 8.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  9. 9.Median year homes were built: 1970. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  10. 10.Housing units (ACS 5-year): 37,003. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  11. 11.Florida Statutes, section 627.7011 (2026). Read Oct 4, 2026.
  12. 12.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  13. 13.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  14. 14.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
  15. 15.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  16. 16.Miami-Dade County RER notice. Read Oct 5, 2026.
  17. 17.City of Miami Gardens - Building Services, City of Miami Gardens. Read Oct 5, 2026.
  18. 18.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  19. 19.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  20. 20.Florida Statutes, section 553.842 (2026), Florida Legislature. Read Oct 5, 2026.
  21. 21.miamidade.gov, miamidade.gov. Read Oct 5, 2026.
  22. 22.Florida Statutes, section 489.113 (2026), Florida Legislature. Read Oct 5, 2026.
  23. 23.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  24. 24.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  25. 25.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Miami Gardens 2020 Census internal point (25.9487, -80.2436), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  28. 28.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Miami Gardens 2020 Census internal point (25.9487, -80.2436), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  29. 29.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.

South Fork Roofing

Roof replacement in Miami Gardens

Answer a few questions about the job, or call.

CallFree estimate