Skip to content

New construction · Key Biscayne

New construction roofing in Key Biscayne, FL

Only 4.8 percent of Key Biscayne homes were built in 2010 or later, so a new roof here is a rare job. It goes in under the High Velocity Hurricane Zone rules that apply across Miami-Dade County, with Notice of Acceptance products and a permit from the Village.

Updated October 2026

Twisted tree on a beach leaning over calm water at dusk with distant buildings on the horizon.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: Key Biscayne Miami Florida Travel Photography by Giuseppe Milo, CC BY 3.0, cropped

Code edition

Code edition for a Key Biscayne permit

Plans filed with the Village of Key Biscayne permitting office before December 31, 2026 are reviewed under the Eighth Edition, which took effect on December 31, 2023. Anything submitted on or after that 2026 date meets the Ninth Edition. The filing date, not the start of construction, decides which book your roof follows.

Across Miami-Dade County, the HVHZ roofing chapter governs, since the county sits in that zone alongside Broward. For new low-slope roofs it sets a minimum deck slope of 1/4:12 and bars loose laid systems.

Roof build-up

Deck, underlayment and approved products

Roofing falls in the category where statewide product approval is mandatory. In Miami-Dade County, the Product Control Section reviews roofing systems, and the HVHZ permit application carries the Notice of Acceptance numbers. Each notice carries an expiry date, so read it on your product's copy and keep that copy at the job site for the Building Official.

Sheathing nails must be ring shank, 2 1/2 inches long. Over that deck, the code allows three ways to dry in a shingle or metal roof. One is a fully self-adhering underlayment. Another is a 3 3/4-inch tape strip over every deck joint plus underlayment. The third is two layers of felt fastened at 12 inches on center in the field.

Soil sampled within a block of the coast after Hurricane Irma was moderately saline, a reminder that salt exposure reaches this island's roofs. Ask your roofer which fasteners and flashing the approved product calls for.

Inspections

Scheduling the roof with the build

On a Key Biscayne build, the sheathing inspection has to pass before your crew covers the deck. After that comes the roofing inspection of dry-in, insulation, coverings and flashing, then the final. Book your roofer to arrive after framing and sheathing sign-off, not before.

Only a certified or registered roofing contractor may do tile, metal or membrane work. A builder doing its own new construction may self-perform asphalt shingles and nothing more. Look up the roofer's state license before you sign anything.

The Village permit card warns that skipping the recorded Notice of Commencement can mean paying twice for the work. Post the recorded notice on site before your first inspection. Work that stays idle 6 months voids the permit.

Questions

New construction roofing in Key Biscayne: questions

What is the 25% roof rule in Florida?

Florida allows no more than 25 percent of a roof section to be repaired, replaced or recovered in any 12-month stretch before the whole section must be redone to current code. The carve-out covers a roof that already follows the 2007 Florida Building Code or later, where only the repaired part must meet current code. Miami-Dade repeats the rule in its HVHZ chapter. For a Key Biscayne roof, confirm how it applies with the Village building office.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: New construction roofing

Do Key Biscayne roofs need a Miami-Dade Notice of Acceptance?

Yes. Miami-Dade County is in the High Velocity Hurricane Zone, and the roofing permit application carries the product approval or Notice of Acceptance numbers. The Product Control Section of Miami-Dade County reviews roofing systems and certifies the labs that test them. A notice stops being valid on its expiration date. Ask your roofer for the notice number and expiry before materials are ordered.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: New construction roofing

How long does a builder stand behind a new roof in Florida?

A builder must cover a newly built home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation, under a rule in force since July 1, 2025. The clock begins on the earlier of title transfer or first occupancy. Wear and tear, owner-caused defects and storm damage are carved out. With 23.7% of Key Biscayne units vacant and held for seasonal use, write down your occupancy date.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Key Biscayne

Sources for this page(30)
  1. 1.Permit office: Village of Key Biscayne - Building, Zoning and Planning - Permitting. Village of Key Biscayne - Building, Zoning and Planning - Permitting. Read Oct 10, 2026.
  2. 2.Wikipedia, 'Key Biscayne, Florida' (revision 1375547449). Read Oct 5, 2026.
  3. 3.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017). Read Oct 5, 2026.
  4. 4.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  7. 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
  9. 9.Share of homes built 2010 or later: 4.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  11. 11.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  12. 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  13. 13.Miami-Dade County RER notice. Read Oct 5, 2026.
  14. 14.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  15. 15.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  16. 16.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  17. 17.miamidade.gov. Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  20. 20.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  21. 21.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  22. 22.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  23. 23.Village of Key Biscayne - Building, Zoning and Planning - Permitting, Village of Key Biscayne. Read Oct 5, 2026.
  24. 24.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  25. 25.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  26. 26.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  27. 27.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  28. 28.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Key Biscayne 2020 Census internal point (25.6907, -80.1656), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  29. 29.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Key Biscayne 2020 Census internal point (25.6907, -80.1656), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Key Biscayne

Answer a few questions about the job, or call.

CallFree estimate