Commercial roofs · Kendall
Commercial roofing in Kendall, FL
In Kendall, 34.4 percent of homes are in buildings with 10 or more units. That means many roofs here belong to associations and property managers, not single owners. Kendall is inside the High-Velocity Hurricane Zone, so your low-slope roof follows stricter rules, and the county building office issues the permit.
Updated October 2026

Our workHVHZ code
Which rules apply to a Kendall commercial roof
Miami-Dade County, where Kendall is located, is one of just two counties placed in the High-Velocity Hurricane Zone. The code requires an HVHZ Uniform Roofing Permit Application, signed by a licensed contractor, for any new roof, recover, repair or maintenance. Even small repairs on a Kendall building need a permit.
The county's Product Control Section approves roofing products and systems. Ask for the Notice of Commencement on the permit card and the Notice of Acceptance number for each product. Under the standard NOA wording, a copy must be available at the job site for the building official, and an expired NOA is not valid.
Building age matters here. The median Kendall home dates to 1978, and Hurricane Andrew severely damaged the area in 1992. Under the 25 percent rule, repairing more than a quarter of a roof section in 12 months can trigger replacement of the whole section, unless the roof already met the 2007 code or later.
Flat roof details
Low-slope systems, drainage and ponding
Multi-unit buildings in Kendall often have low-slope roofs. For new construction, HVHZ rules set a minimum deck slope of 1/4:12, and loose-laid ballasted systems are not permitted. Built-up, modified bitumen, single-ply and spray foam roofs each carry a 2 percent minimum design slope.
Miami International Airport averages 67.41 inches of rain a year, so drainage decides how long a flat roof lasts. Code defines positive drainage as clearing the roof within 48 hours of rain. Where a parapet traps water, secondary overflow drains or scuppers are required.
On a reroof, the contractor must tell you in writing about any chance of ponding water and recommend a structural review. A new system may not go over wet or deteriorated sheathing, and two or more existing layers mean a full tear-off.
Comparing bids
How a property manager should compare bids
- The same system, product approval numbers and NOA expiration dates on every bid.
- Deck repair and wet-sheathing replacement stated as separate line items.
- Find out which party will pull the permit and which will record the Notice of Commencement.
- How ponding water and overflow drains are handled.
- Inspection stages: before the membrane is concealed, and a final.
Before signing anything, confirm that the contractor holds a valid state roofing license. Unless a general contractor is certified or registered as a roofing contractor, advertising under that title is not allowed. Also note that the Ninth Edition code takes effect December 31, 2026, so permit timing can change the rules.
Questions
Commercial roofing in Kendall: questions
Does a Kendall commercial roof need a county permit?
Yes. Kendall has no city government of its own, so you pull roof permits through Miami-Dade County Regulatory and Economic Resources. In the High-Velocity Hurricane Zone, any new roofing, recover, reroof, repair or maintenance needs an HVHZ Uniform Roofing Permit Application signed by a licensed contractor. Confirm current forms with the building office before work starts.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Why are Kendall roofs held to HVHZ rules?
The High-Velocity Hurricane Zone covers only two counties, Miami-Dade among them, and its strong provisions are ones South Florida adopted after Hurricane Andrew. Kendall was severely damaged by Andrew in 1992. Products must have a Miami-Dade Notice of Acceptance, and inspections happen before the membrane is concealed and at final.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
What does the 25 percent rule mean for my building?
Whenever repairs, replacement or recovering touch more than 25 percent of a roof section within 12 months, the entire section has to be replaced or recovered. The exception applies only if that roof was built or repaired to the 2007 Florida Building Code or later. With a median build year of 1978 for Kendall homes, ask the building office how it applies to your roof.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026
Can a new low-slope roof go over the old one?
Sometimes, but not always. A tear-off to the deck is required if the old roof is water soaked, has two or more layers, or cannot meet securement rules. In the HVHZ, a new system may not go over deteriorated sheathing. Kendall's high share of 10+ unit buildings makes a deck inspection before bidding worth requiring.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026
Nearby
Commercial roofing near Kendall
Sources for this page(29)
- 1.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 2.Wikipedia, 'Kendall, Florida' (revision 1374451126). Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 4.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 5.Share of homes in buildings with 10+ units: 34.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 6.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service). Read Oct 5, 2026.
- 7.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 8.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 9.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 10.miamidade.gov. Read Oct 5, 2026.
- 11.FBC-B 2023 Ch. 15. Read Oct 5, 2026.
- 12.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 13.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 14.Miami-Dade County RER notice. Read Oct 5, 2026.
- 15.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 16.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 17.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 18.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 19.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 20.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
- 21.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 22.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 23.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Kendall 2020 Census internal point (25.6673, -80.3528), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 24.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Kendall 2020 Census internal point (25.6673, -80.3528), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 29.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
South Fork Roofing
Commercial roofing in Kendall
Answer a few questions about the job, or call.
