Skip to content

New construction · Port Salerno

New construction roofing in Port Salerno, FL

Only 3.4 percent of Port Salerno homes were built in 2010 or later, so new roofs here are rare and the rules around them are easy to miss. Martin County permitted 843 single-family units in 2025. Any new roof starts with a county permit and a code edition set by the date you apply.

Updated October 2026

A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.

Code edition

The code edition that governs a permit in Port Salerno

Because Port Salerno is unincorporated, permits come from the Martin County Building Department. The Eighth Edition of the Florida Building Code has been the governing version since December 31, 2023. An application filed on December 31, 2026 or later goes under the Ninth Edition. The filing date decides it, not the day you start framing.

The high-velocity hurricane zone stops at Broward and Miami-Dade, so a Port Salerno plan follows the standard wind-borne debris rules and no Miami-Dade product notice is needed. Roofing products still need statewide approval under Fla. Stat. 553.842, and the permit application should list the approval numbers.

Roof assembly

What goes on a new Port Salerno roof deck

Roof sheathing on a new home must be nailed with ring shank nails, 2 1/2 inches long by 0.131 inch, under FBC-Residential R803.2.3.1. Once you reach that point on a shingle, metal or similar roof, three dry-in methods are open to you. These are a fully self-adhering membrane, a 3 3/4-inch tape or membrane strip over every deck joint plus underlayment, or two layers of felt underlayment.

Metal edging at the eaves and gables sits over the underlayment, nailed 12 inches apart, or 4 inches apart where the design wind speed is 110 mph or more. Where eaves project less than 6 inches, you need gutters with downspouts, and each downspout has to discharge 1 foot from the wall. For tile, you follow the manufacturer's instructions or the Florida High Wind tile manual, and the tile goes over solid sheathing.

Build schedule

Scheduling the roof with the inspections

Inspections run in the order the code gives: foundation, framing, sheathing, exterior walls, roofing, then final. Sheathing can be inspected as a dry-in or separately. Roofing is its own inspection covering dry-in, roof coverings and flashing. Book the roofer after the sheathing passes, and do not let shingles go on before the dry-in is signed off.

Your permit becomes invalid if work has not begun within 6 months of issuance or if it halts for 6 months. A builder putting up their own new building can install the asphalt shingles on it themselves. Tile, metal and membrane work must go to a roofing contractor holding state certification or registration. An owner can also choose a private provider for inspections under Fla. Stat. 553.791.

Questions

New construction roofing in Port Salerno: questions

Does a new roof in Port Salerno need a Notice of Commencement?

Usually yes. The Florida Building Code requires the permit card to warn that skipping the Notice of Commencement may mean paying twice for the work. Have the notice recorded and posted at the job before the first inspection comes. Under Fla. Stat. 713.135 the Martin County Building Department asks for a copy at that point when the direct contract is above a set amount. Confirm the threshold with the building office.

Source: Martin County Building Department, read Oct 5, 2026

Related: New construction roofing

Can my general contractor install the roof on a new house?

Only in one case. On a new building it constructed itself, a general, building or residential contractor is allowed to install asphalt or fiberglass shingles, or wood shingles and shakes. Anything else goes to a roofing contractor with a state certificate or registration. Check any license on the state lookup before signing, and ask the Martin County Building Department who is named on the permit.

Source: Martin County Building Department, read Oct 5, 2026

Related: New construction roofing

How long does a builder answer for a new Port Salerno roof?

Fla. Stat. 553.837, in effect since July 1, 2025, makes a builder warrant a new home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. Title transfer or first occupancy, whichever is earlier, starts that year. The exclusions cover normal wear, settling, defects the owner caused, and acts of God such as a natural disaster. Read your contract for anything longer.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Why does product approval matter on a Port Salerno roof after Hurricane Milton?

Hurricane Milton spawned two tornadoes that hit Port Salerno on October 9, 2024, and a spotter reported roof damage. For a new roof, that is a reason to read the permit closely. Roofing is a mandatory statewide-approval category under Fla. Stat. 553.842, and a product may not be sold as hurricane protection unless it is approved. Ask to see the approval numbers before work starts.

Source: Wikipedia, 'Port Salerno, Florida' (revision 1375172719), read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Port Salerno

Sources for this page(33)
  1. 1.Permit office: Martin County Building Department. Martin County Building Department. Read Oct 10, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  4. 4.Share of homes built 2010 or later: 3.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Wikipedia, 'Port Salerno, Florida' (revision 1375172719). Read Oct 5, 2026.
  8. 8.NOAA Storm Prediction Center, preliminary storm reports 2024-10-09 (12Z-12Z). Read Oct 5, 2026.
  9. 9.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  10. 10.Miami-Dade County RER notice. Read Oct 5, 2026.
  11. 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  12. 12.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  13. 13.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  14. 14.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  15. 15.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  16. 16.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  17. 17.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  18. 18.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  20. 20.Martin County Building Department, Martin County Building Department. Read Oct 5, 2026.
  21. 21.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  22. 22.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  23. 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  24. 24.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  25. 25.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  26. 26.Florida Building Commission, Florida Building Commission. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  29. 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  30. 30.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  31. 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Port Salerno 2020 Census internal point (27.1452, -80.1887), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  32. 32.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  33. 33.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Port Salerno 2020 Census internal point (27.1452, -80.1887), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Port Salerno

Answer a few questions about the job, or call.

CallFree estimate