New construction · Jupiter Island
New construction roofing in Jupiter Island, FL
About 14.2 percent of Jupiter Island homes were built in 2010 or later, so new construction is a small slice of a housing stock with a 1985 median. If you are building here, the roof falls under whichever code edition your permit application meets, and the town Building Department handles the permit.
Updated October 2026

Our workCode edition
Which code edition your permit faces
Since December 31, 2023, projects in Florida have fallen under the Eighth Edition of the building code. The Ninth Edition takes over on December 31, 2026, and every application submitted on or after that date must meet it. If your plans reach the Town of Jupiter Island Building Department near that date, the filing date decides which edition your roof is built to.
Martin County is not one of the two counties in the High Velocity Hurricane Zone, so a Jupiter Island roof does not need the Miami-Dade style approvals used there. It still needs statewide product approval for the roofing, and the permit should list those approval numbers. Confirm the exact submittal list with the building office.
County records show 843 single-family units permitted in 2025, up from 479 in 2020. That suggests the area's building trades are busy, so book your roofer early in the schedule rather than after the framing is done.
Roof assembly
Deck, underlayment and dry-in for a new roof
Roof sheathing on a new home must be fastened with ring shank nails. The code names 2 1/2 inch by 0.131 inch nails as the standard, with other ring shank types allowed on thinner sheathing. Find out which nail your framers plan to use before the sheathing is inspected.
Dry-in for shingle or metal roofs has three code options. Self-adhering membrane over the entire deck is the first. A 3 3/4 inch strip of membrane or tape over every deck joint, then underlayment over everything, is the second. The last is a double layer of felt-type underlayment, nailed 12 inches apart in the field and 6 inches apart at laps. Tile goes only over solid sheathing, following the manufacturer or the Florida High Wind tile manual.
Shingle drip edge goes over the underlayment at eaves and gables, fastened no more than 12 inches apart, or 4 inches apart where design wind speed is 110 mph or higher. A metal roof follows the same statewide approval rule, and its approval number belongs on the permit.
Build sequence
Scheduling the roof and the inspections
Inspections follow the sequence the code sets out: foundation, framing, sheathing, exterior wall coverings, roofing, then final. At the roofing stage the inspector looks at dry-in, insulation, coverings and flashing. Your roofer should be on site once the sheathing passes, not before.
Florida lets a builder put on shingles itself only for a new building it is constructing. Tile, metal and membrane work belongs to a roofing contractor holding state certification or registration. Check the license of whoever signs your roofing contract.
About 92.3 percent of Jupiter Island housing units are single-family detached homes, and 36.4 percent are vacant and held for seasonal or occasional use. If you will not be on the island during construction, name someone who can meet the inspector, since a permit lapses if work is suspended for 6 months.
Questions
New construction roofing in Jupiter Island: questions
Who issues roofing permits for new homes on Jupiter Island?
The Town of Jupiter Island Building Department handles roof permits here. Your builder or roofing contractor normally files the application. Ask the building office for the current submittal list, since it decides which product approval numbers and plans it wants. Martin County is outside the High Velocity Hurricane Zone, so the Miami-Dade style approval process does not apply, but statewide product approval for roofing does.
Source: Town of Jupiter Island - Building Department, read Oct 5, 2026
Which Florida Building Code edition applies to a new Jupiter Island roof?
The answer turns on the date your permit application goes in. December 31, 2023 is the date the Eighth Edition became effective. The Ninth Edition becomes effective December 31, 2026, and any application or plans submitted on or after that date must comply with it. If your filing falls near that date, ask the Jupiter Island building office which edition will be applied.
Source: Town of Jupiter Island - Building Department, read Oct 5, 2026
Does a new Jupiter Island home come with a builder warranty on the roof?
Florida law requires a builder to warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that result in a material violation of the Florida Building Code. This applies from July 1, 2025. Coverage leaves out ordinary wear and tear, settling, defects the owner caused and acts of God, such as a natural disaster. Read your own contract for anything beyond that.
Source: Town of Jupiter Island - Building Department, read Oct 5, 2026
Is a metal roof a good idea on a new Jupiter Island home?
A metal roof is allowed here, and the answer depends on the product and the install. Roofing needs statewide product approval, and its number goes on the permit. Metal is installed by a roofing contractor with state certification or registration, not by a builder acting alone. With 36.4 percent of island homes held for seasonal use, ask how the system is fastened and who inspects it while you are away.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, via Census Reporter API, read Oct 5, 2026
Sources for this page(31)
- 1.Permit office: Town of Jupiter Island - Building Department. Town of Jupiter Island - Building Department. Read Oct 10, 2026.
- 2.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, via Census Reporter API. Read Oct 5, 2026.
- 6.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 7.Share of homes built 2010 or later: 14.2%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 8.Median year homes were built: 1985. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 9.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 10.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 13.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 14.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 17.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 18.Town of Jupiter Island - Building Department, townofjupiterisland.com. Read Oct 5, 2026.
- 19.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, B01001, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 20.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 21.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 22.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 23.Wikipedia, 'Jupiter Island, Florida' (revision 1373512492), Wikipedia. Read Oct 5, 2026.
- 24.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 26.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Jupiter Island 2020 Census internal point (27.0269, -80.1019), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Jupiter Island 2020 Census internal point (27.0269, -80.1019), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.