New construction ยท Port St. John
New construction roofing in Port St. John, FL
1.9 percent of homes in Port St. John were built in 2010 or later, far below the county's 10.9 percent. If you are building or buying new here, the roof is one of the last steps before the home is dried in. The permit, sheathing, underlayment and inspection order all shape when the roof goes on.
Updated October 2026

Code and inspections
What a new roof must pass before it goes on
Florida's 2023 Building Code, Eighth Edition, applies to permits filed now. Ninth Edition rules apply to any permit filed on December 31, 2026 or later. If your build spans that date, ask the Brevard County building office which edition governs your application.
The roof must pass the inspections in the order the code lists them. Framing comes first, then sheathing, which can be a dry-in inspection or a separate one you request once all roof and wall sheathing is fastened. Roofing is inspected after that. Skipping a step means the next inspection will not pass.
- Roof sheathing fastened with ring shank nails
- Dry-in underlayment in one of three code options
- Drip edge fastened at eaves and gables
- Tile, if used, laid over solid sheathing only
Contractor and product rules
Which crew does the install, and who inspects and approves the finished work
In Port St. John, a builder without a roofing certificate or registration has to hand the roof to someone who holds one. The only exception is asphalt or fiberglass shingles on a new building the builder constructed itself. Tile, metal and membrane always go to a certified or registered roofing contractor.
Roofing products must carry statewide approval. Check the Florida Building Commission product approval search by FL number before you accept materials. In Brevard, the permit application carries those approval numbers.
Questions
New construction roofing in Port St. John: questions
Do I need a permit for a new roof on a new build in Port St. John?
Yes. Permits for roofing in this area are issued by the county building office. The code requires the inspection sequence to be followed, and the permit must be active while work progresses. Permits lapse if work does not start within 6 months or is suspended for 6 months. Ask Brevard County Planning and Development to confirm your permit status before scheduling the roof crew.
Source: Brevard County Planning & Development, Building Permits, read Oct 5, 2026
Which building code edition applies to my new home roof?
The 2023 Eighth Edition applies to permits filed now. Any application filed on December 31, 2026 or later has to meet the requirements of the Ninth Edition. Since only 1.9 percent of Port St. John homes were built in 2010 or later, most homes here are re-roofs rather than new builds, so confirm the edition on your specific permit.
Source: FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, read Oct 5, 2026
Can I put a notice of commencement off until the roof is finished?
No. The notice must be recorded and posted on the job site before the first inspection. If you skip logging it, you could end up covering the cost of those improvements a second time. Brevard County requires a copy before the first inspection when the direct contract is above a set amount.
Source: Florida Statutes, section 713.135 (2026), read Oct 5, 2026
Do gutters and downspouts have to be on a new Port St. John home?
Eaves that stick out less than 6 inches need gutters with downspouts, unless the edge is a gable end rake or the roof sits above another roof. Water from downspouts has to exit at least 1 foot away from the wall, through buried pipe, extensions at the tail, or splash blocks.
Source: 2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Sources for this page(28)
- 1.Permit office: Brevard County Planning & Development, Building Permits. Brevard County Planning & Development, Building Permits. Read Oct 10, 2026.
- 2.Brevard County, Building Code Wind Speed Maps. Read Oct 5, 2026.
- 3.City of West Melbourne, Building Department. Read Oct 5, 2026.
- 4.Share of homes built 2010 or later: 1.9%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 7.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 8.Miami-Dade County RER notice. Read Oct 5, 2026.
- 9.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-3 (the research cites it "as C-3").
- 10.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 11.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from COM-29 (the research cites it "as COM-29").
- 12.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 13.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 14.Florida Building Commission. Read Oct 5, 2026.
- 15.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 17.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 18.Brevard County Planning & Development, Building Permits, Brevard County Planning & Development. Read Oct 5, 2026.
- 19.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 20.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 21.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 22.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 23.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
- 24.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 25.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 26.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Port St. John 2020 Census internal point (28.4757, -80.8104), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 27.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Port St. John 2020 Census internal point (28.4757, -80.8104), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 28.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Port St. John
Answer a few questions about the job, or call.
