Skip to content

Commercial roofs · Merritt Island

Commercial roofing in Merritt Island, FL

Merritt Island had 34,518 residents at the 2020 Census, spread over about 17 square miles of land, and its roof permits come from Brevard County, not a city hall. That shapes every commercial job here: the county building office reviews your plans, and the 2023 Florida Building Code applies, not the Miami-Dade and Broward High-Velocity Hurricane Zone rules.

Updated October 2026

Calm sunlit water with a shoreline of palm trees and a small waterfront house under cumulus clouds.
A low-slope roof section with a granulated cap sheet in the foreground meeting a gray shingle slope, neighboring homes and a cloudy sky behind.Our work
Photo: Merritt Island, Florida (southern tip) by Leonard J. DeFrancisci, CC BY-SA 3.0, cropped

Merritt Island figures this page uses

Housing units (ACS 5-year)
17,006
People (2020 Census)
34,518
Land area
17sq mi

Permits and code

Who permits a commercial roof on Merritt Island

Merritt Island is an unincorporated census-designated place, so Brevard County Planning & Development issues the roofing permit. Confirm the current submittal steps with that office before you sign a bid. The county also publishes address-level wind speed maps by risk category, and your designer should use the one for your parcel.

The edition currently in force is the 2023 Florida Building Code, Eighth Edition. The Ninth Edition takes effect on December 31, 2026, and any application filed on or after that date must comply with it. If your project is close to that date, ask your contractor which edition the plans will be reviewed under.

A commercial roof falls under the same 25 percent rule. Repair or replace more than 25 percent of a roof section in 12 months and the whole section must be brought up to code. A roof that itself was built, repaired or replaced under the 2007 code or any later edition is the one exception, and then only the repaired part must comply.

Building stock

What the buildings and weather here demand

Merritt Island has 17,006 housing units, and 59.0 percent were built before 1980, against 32.1 percent countywide. Many multi-unit buildings and associations here are therefore older, and the share built before 1980 is nearly double the county figure. Older buildings are more likely to have layered roofs, which matters for tear-off rules.

A recover over an existing roof is barred where the old roof is water soaked, where there are two or more layers already, or where the old covering cannot meet the securement rules. Then the job is a full tear-off to the deck. Ask any bidder to inspect and document the deck condition before pricing a recover.

Water covers 63.3 percent of the area counted here, and Hurricane Irma in 2017 brought an EF-1 tornado to Merritt Island that damaged numerous homes and a church. Brevard County also recorded 81 mph at Merritt Island in Hurricane Matthew. Edge metal and wind uplift ratings deserve close attention on any flat or low-slope roof.

Flat roof details

Low-slope systems, drainage and comparing bids

New low-slope roofs need a design slope of at least one-fourth unit in 12 for built-up, modified bitumen, single-ply, foam and liquid-applied systems. Drains need secondary overflow where the parapet could trap water. A roof has positive drainage when it sheds water within 48 hours of rain.

Compare bids on the same points: the membrane standard named, such as ASTM D6878 for TPO, the edge metal test method, drain and overflow details, and who handles the Notice of Commencement. Brevard County received roughly 55 inches of rain a year at nearby Titusville, with 41 percent falling June through August, so drainage detail is not optional.

Questions

Commercial roofing in Merritt Island: questions

Who permits a commercial roof on Merritt Island?

Brevard County Planning & Development issues roofing permits here, because Merritt Island is an unincorporated census-designated place with no city building department. Confirm current submittal requirements with the county building office. Plans are reviewed under the 2023 Florida Building Code now, and applications filed on or after December 31, 2026 fall under the Ninth Edition. Your contractor should tell you which edition applies to your filing date.

Source: Brevard County Planning & Development, Building Permits, read Oct 5, 2026

Related: Commercial roofing

What is the 25% roof rule in Florida?

Whenever you repair, replace or recover more than 25 percent of a roof section within any 12-month period, the entire section has to meet current code. The one exception is a roof that was built, repaired or replaced under the 2007 Florida Building Code or later, where only the repaired part must comply. Merritt Island's median home build year is 1973, so check the roof's own history rather than assuming.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: Commercial roofing

Does the High-Velocity Hurricane Zone apply to Merritt Island?

No, because that zone is limited to Broward and Miami-Dade counties, and Merritt Island sits in Brevard County. Your project follows the standard Florida Building Code. Brevard County publishes address-level wind speed maps by risk category for permitting, so your designer uses the map for your parcel. Ask the county building office to confirm the wind speed for your address.

Source: FBC-Building 2023 Chapter 2 definitions, read Oct 5, 2026

Related: Commercial roofing

Can a new commercial roof go over the old one?

Sometimes, but not if the existing roof is water soaked, has two or more layers, or cannot meet securement rules. The code then calls for a full tear-off down to the deck. With 59.0 percent of Merritt Island's housing units built before 1980, layered or worn roofs are likely. Have the deck inspected before choosing a recover.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: Commercial roofing

Nearby

Commercial roofing near Merritt Island

Sources for this page(32)
  1. 1.Permit office: Brevard County Planning & Development, Building Permits. Brevard County Planning & Development, Building Permits. Read Oct 10, 2026.
  2. 2.Brevard County, Building Code Wind Speed Maps. Read Oct 5, 2026.
  3. 3.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
  4. 4.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017). Read Oct 5, 2026.
  5. 5.Hurricane Matthew (2016). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
  6. 6.City of West Melbourne, Building Department. Read Oct 5, 2026.
  7. 7.Housing units (ACS 5-year): 17,006. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  8. 8.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
  9. 9.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER). Read Oct 5, 2026.
  11. 11.Hurricane Irma (2017). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017). Read Oct 5, 2026.
  12. 12.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API. Read Oct 5, 2026.
  13. 13.People (2020 Census): 34,518. U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER) (2020 Census count). Read Oct 5, 2026.
  14. 14.Land area: 17 sq mi. U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER). Read Oct 5, 2026.
  15. 15.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
  16. 16.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  17. 17.Miami-Dade County RER notice. Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.FBC-B 2023 Ch. 15. Read Oct 5, 2026.
  20. 20.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  21. 21.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  22. 22.Brevard County Planning & Development, Building Permits, Brevard County Planning & Development. Read Oct 5, 2026.
  23. 23.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER) (2020 Census count), U.S. Census Bureau. Read Oct 5, 2026.
  24. 24.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
  25. 25.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  26. 26.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  27. 27.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  28. 28.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  29. 29.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Merritt Island 2020 Census internal point (28.3092, -80.6760), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  31. 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Merritt Island 2020 Census internal point (28.3092, -80.6760), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  32. 32.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.

South Fork Roofing

Commercial roofing in Merritt Island

Answer a few questions about the job, or call.

CallFree estimate