Commercial roofs · Tequesta
Commercial roofing in Tequesta, FL
In Tequesta, 35.7 percent of homes are in buildings with 10 or more units, so many roofs here cover several households at once. Those are low-slope or large-area roofs, and the Village of Tequesta Building Department issues the permit. The Miami-Dade style hurricane-zone roofing rules do not reach this village.
Updated October 2026

Our workTequesta figures this page uses
- Share of homes in buildings with 10+ units
- 35.7%
- Housing units (ACS 5-year)
- 3,424
- Seasonal, recreational or occasional-use homes (share of all units)
- 12.9%
Permits and code
Permit authority and the governing code
Roof permits in Tequesta go through the Village of Tequesta Building Department. The High-Velocity Hurricane Zone covers Miami-Dade and Broward only. That means the Miami-Dade style HVHZ roofing permit application does not apply to your building.
December 31, 2023 marked the effective date of the Florida Building Code, Eighth Edition (2023). Starting December 31, 2026 the Ninth Edition governs, so any application filed on or after that date has to meet it. If your Tequesta reroof is close to that date, ask the building office which edition will govern your application.
Mind the 25 percent rule on a multi-unit roof. Repair or replace more than 25 percent of one roof section within 12 months, and the entire section has to be upgraded to current code. An exception exists only where that roof was built or replaced under the 2007 Florida Building Code or later.
Flat roof systems
Low-slope roofs on Tequesta multi-unit buildings
Large multi-unit buildings usually carry built-up, modified bitumen or single-ply roofs. New low-slope roofs must be built with at least a one-fourth unit in 12 slope. Tequesta has 3,424 housing units and a median build year of 1977, so many older buildings may have flat roofs with settled decks where water collects.
How well a flat roof drains determines its service life. Code defines positive drainage as water clearing the roof within 48 hours of rain, and it requires overflow drains or scuppers where a parapet could trap water. Water makes up 18.8% of Tequesta's area, and storm drains are sized on the 100-year hourly rainfall rate.
A recover over the old roof is barred if the existing roof is water soaked or already has two or more coverings. Here, the existing roof is stripped down to the deck. Ask any bidder to state which route they are pricing and why.
Bid comparison
Comparing bids as a property manager
- Ask each bidder to name the roof system and its material standard, such as ASTM D6878 for TPO sheet.
- Confirm the plan for drains, overflow scuppers and any ponding areas.
- Check who holds the roofing contractor license, since a general contractor may not hold itself out as a roofing contractor without one.
- Make sure the owner records the Notice of Commencement before the first inspection.
- Keep the permit alive: it lapses if work does not start within 6 months.
About 12.9 percent of Tequesta homes are held for seasonal use. An association with many absent owners should settle who signs off on the scope before the permit is filed.
Questions
Commercial roofing in Tequesta: questions
Does a Tequesta commercial roof need Miami-Dade approvals?
No. Palm Beach County is outside the High-Velocity Hurricane Zone, which covers only Miami-Dade and Broward. Roofing products here need Florida statewide product approval instead, and the Village of Tequesta Building Department handles the permit. You can search products by FL number in the Florida Building Commission lookup. A bidder who quotes a Miami-Dade Notice of Acceptance is not showing what Tequesta requires.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
What is the 25% rule for roofing in Tequesta?
Once repairs, replacement or recovering touch more than 25 percent of a roof section in any 12-month period, you must replace or recover the full section to current code. The exception covers a roof built or replaced under the 2007 Florida Building Code or later, which took effect March 1, 2009. On a Tequesta building with a 1977 median build year, ask your roofer which side your roof falls on.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Who permits a roof on a Tequesta apartment or condo building?
Roof permits come from the Building Department of the Village of Tequesta. About 35.7 percent of Tequesta homes are in buildings with 10 or more units, so many association roofs go through this office. Palm Beach County also runs a self-issued reroof process for qualifying residential reroofs, but confirm with the village office whether your building qualifies before relying on it.
Source: Village of Tequesta - Building Department, read Oct 5, 2026
Can a flat roof in Tequesta be recovered instead of torn off?
Sometimes, but not always. A recover is barred where the existing roof is water soaked or already has two or more applications of roof covering. Tequesta's median home was built in 1977, so many flat roofs may already have layers. Ask each bidder to show the deck condition and explain in writing whether they are pricing a recover or a full tear-off.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Sources for this page(32)
- 1.Permit office: Village of Tequesta - Building Department. Village of Tequesta - Building Department. Read Oct 10, 2026.
- 2.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 3.Share of homes in buildings with 10+ units: 35.7%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 4.Housing units (ACS 5-year): 3,424. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 6.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 (AREALAND/AREAWATER). Read Oct 5, 2026.
- 7.Seasonal, recreational or occasional-use homes (share of all units): 12.9%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, via Census Reporter API. Read Oct 5, 2026.
- 9.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
- 10.Palm Beach County PZB - Building Division, Self-Issued Reroof Applications. Read Oct 5, 2026.
- 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 13.Miami-Dade County RER notice. Read Oct 5, 2026.
- 14.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.FBC-B 2023 Ch. 15. Read Oct 5, 2026.
- 16.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 20.Florida Building Commission. Read Oct 5, 2026.
- 21.Village of Tequesta - Building Department, Village of Tequesta. Read Oct 5, 2026.
- 22.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 24.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 26.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 30.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Tequesta 2020 Census internal point (26.9649, -80.1132), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 32.Wikipedia, 'Tequesta, Florida' (revision 1375551394), Wikipedia. Read Oct 5, 2026.
South Fork Roofing
Commercial roofing in Tequesta
Answer a few questions about the job, or call.
