Re-roofs · Jupiter Inlet Colony
Roof replacement in Jupiter Inlet Colony, FL
In Jupiter Inlet Colony, 45.4 percent of homes were built before 1980, so many owners here have an older house under the roof. That age matters when you replace it. A re-roof in Florida brings a permit, two inspections and code upgrades you should know before you sign anything.
Updated October 2026

Jupiter Inlet Colony figures this page uses
- Median year homes were built
- 1989
- Share of homes built 2010 or later
- 25.2%
- Owner-occupied share of occupied homes
- 96.6%
- Single-family detached share of housing units
- 97.5%
Housing age
How old homes here affect your roof
The median home here dates to 1989, close to the Palm Beach County median of 1986. Yet 25.2 percent of homes went up in 2010 or later, against 9.2 percent countywide. So the town mixes older houses with a good number of newer ones.
Almost all of the housing is single-family detached, 97.5 percent, and 96.6 percent of occupied homes are owner-occupied. That suggests most roofing decisions here sit with the person living under the roof, not a landlord or association.
Insurance adds a clock. Florida law allows you to hire an authorized inspector, at your own cost, to examine any roof that is 15 years old or more. If the report shows 5 or more years of useful life left, your insurer may not refuse or non-renew solely for roof age. How that rule applies to your specific policy is something your insurer or agent can explain.
Code and permit
What a Florida re-roof triggers
Roof permits in this area come from the Town of Jupiter Inlet Colony Building Department. Palm Beach County sits outside the High Velocity Hurricane Zone, which takes in only Miami-Dade and Broward. That means the standard Florida Building Code applies, not the stricter HVHZ roofing rules.
The 25 percent rule matters most. If you repair, replace or recover more than 25 percent of a roof section in any 12-month period, the whole section must be redone to current code. The exception covers a roof that was itself built, repaired or replaced under the 2007 Florida Building Code or later, and the town cannot amend that exception.
Roofing work also covers required roof-deck attachment and any repair of wood sheathing found during the job. Ask your contractor to show how the deck will be nailed and how the secondary water barrier will go on. Confirm current inspection steps with the building office.
Storms and timing
Timing a replacement near the inlet
Hurricane Irma in 2017 put 2-4 feet of surge above ground along the Palm Beach County coast, and Matthew in 2016 brought tropical-storm-force winds to the same coast. A town sitting on the Jupiter Inlet shares that exposure.
The Atlantic season lasts from June 1 through November 30 and reaches its peak on September 10. A permit also expires if work does not start within 6 months of issue, so schedule the start with that clock in mind.
Questions
Roof replacement in Jupiter Inlet Colony: questions
What is the 25% roof rule in Florida?
Once you repair, replace or recover more than 25 percent of a roof section within any 12-month period, current code requires replacing that whole section. The exception applies when a roof was built, repaired or replaced under the 2007 Florida Building Code or any later edition. Then only the part you redo must meet current code. With 45.4 percent of Jupiter Inlet Colony homes built before 1980, check which rule fits your roof with the Building Department.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Who issues a roof permit in Jupiter Inlet Colony?
The Town of Jupiter Inlet Colony Building Department handles roof permits. Palm Beach County is not in the High Velocity Hurricane Zone, so the standard Florida Building Code governs your roof. Your contractor normally pulls the permit. Before the first inspection, a Notice of Commencement must be recorded and posted on the job site, so confirm current steps with the building office.
Source: Town of Jupiter Inlet Colony - Building Department, read Oct 5, 2026
My roof is over 15 years old. Can my insurer drop me?
Florida law says an insurer may not refuse or non-renew solely for roof age if an authorized inspector finds 5 or more years of useful life left. You pay for that inspection. In Jupiter Inlet Colony, 96.6 percent of occupied homes are owner-occupied, so most owners hold their own policy. Ask your insurer or agent how the rule applies to you.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API, read Oct 5, 2026
Does a permit expire if the roofer is slow to start?
Yes. Under the Florida Building Code, a permit lapses when work has not begun within 6 months of issue or when work halts for 6 months. Work stays classed as active only while an approved inspection occurs within every 180 days. In Palm Beach County, hurricane season ends November 30, so plan your start date with the Building Department.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Sources for this page(33)
- 1.Median year homes were built: 1989. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.Share of homes built 2010 or later: 25.2%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 7.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
- 8.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 9.Owner-occupied share of occupied homes: 96.6% (201 of 208). U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
- 10.Single-family detached share of housing units: 97.5%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 11.Permit office: Town of Jupiter Inlet Colony - Building Department. Town of Jupiter Inlet Colony - Building Department. Read Oct 10, 2026.
- 12.Wikipedia, 'Jupiter Inlet Colony, Florida' (revision 1374447611). Read Oct 5, 2026.
- 13.Hurricane Irma (2017). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017). Read Oct 5, 2026.
- 14.Share of homes built before 1980: 45.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 15.Florida Statutes, section 627.7011 (2026). Read Oct 4, 2026.
- 16.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
- 18.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
- 19.NOAA NHC. Read Oct 5, 2026.
- 20.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 21.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 22.Town of Jupiter Inlet Colony - Building Department, Town of Jupiter Inlet Colony. Read Oct 5, 2026.
- 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 24.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 26.Miami-Dade County RER notice, Miami. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Jupiter Inlet Colony 2020 Census internal point (26.9480, -80.0752), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
- 32.Florida Statutes, section 553.842 (2026), Florida Legislature. Read Oct 5, 2026.
- 33.Florida Building Commission, Florida Building Commission. Read Oct 5, 2026.
South Fork Roofing
Roof replacement in Jupiter Inlet Colony
Answer a few questions about the job, or call.