Skip to content

New construction · Juno Beach

New construction roofing in Juno Beach, FL

In Juno Beach, 16.5 percent of homes were built in 2010 or later, so most roofs here sit on older buildings, and the newer ones followed the 2007 Florida Building Code or after. A new roof on a new build faces permit, deck, underlayment and inspection rules in a set order. Here is how that order plays out for a build in Juno Beach.

Updated October 2026

A long wooden pier extends into rolling ocean waves from a pale sandy beach under a cloudy sky.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: Juno Beach Florida Pier by and (c)2016 Derek Ramsey ( Ram-Man ), CC BY-SA 4.0, cropped

Juno Beach figures this page uses

People (2020 Census)
3,858
Housing units (ACS 5-year)
3,658
Share of homes built 2010 or later
16.5%
Median year homes were built
1989

Code edition

Which Code Edition Your Juno Beach Permit Faces

The Eighth Edition of the Florida Building Code has applied to new permits since the last day of 2023. A filing dated December 31, 2026 or later falls under the Ninth Edition. If your plans reach the Town of Juno Beach building office near that date, the filing date decides which book your roof must follow.

Palm Beach County sits outside the High Velocity Hurricane Zone, a zone limited to Broward and Miami-Dade. A Juno Beach roof therefore follows the standard code. Roofing is still a mandatory statewide product approval category, so your shingles, tile or metal must carry a Florida approval number that your permit application lists.

Roof build-up

Sheathing, Dry-In and Drip Edge Steps

Roof sheathing on a new house is nailed with ring shank nails, and the residential code names 2 1/2 inch by 0.131 inch nails as the standard. Smaller ring shank types are allowed where the sheathing is 15/32 inch or thinner. The sheathing inspection looks at these fasteners before the deck is covered.

Before the roof covering goes on a Juno Beach build, the plans must show one of three dry-in methods for shingle and metal roofs. The methods are a full-deck membrane, tape on every deck joint under a second layer, or a double layer of felt-type underlayment held with cap nails. Ask your builder which one the plans call for. Drip edge then goes over the underlayment along the eaves and gables.

Build sequence

Scheduling the Roof Around the Inspections

Florida's inspection order starts with foundation and framing, then sheathing, exterior wall coverings, roofing and final. The roofing inspection covers dry-in, insulation, roof covering and flashing. Your roofer cannot finish ahead of the sheathing sign-off, so a delay upstream pushes the roof date back.

Juno Beach is a town of 3,858 people with 3,658 housing units, and 59.4 percent of those units sit in buildings of 10 or more units. New work here may be a condo building or a single house, and the permit contacts differ. Confirm roof permit steps with the Town of Juno Beach building office. For a house, a Notice of Commencement must be recorded and posted before the first inspection.

On a new Juno Beach house, a builder can lay asphalt shingles with its own crew. Tile, metal and membrane work belongs to a roofing contractor who holds a state certificate or registration.

Questions

New construction roofing in Juno Beach: questions

Does a new home in Juno Beach get a builder warranty on the roof?

Florida Statute 553.837, in effect since July 1, 2025, obligates a builder to warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. Normal wear and tear, settling, defects the owner caused and natural disasters all fall outside that coverage. Whichever comes first, title passing or the home's first occupancy, marks the date when the 1-year period starts. Read your purchase contract for what else it states.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Is Juno Beach in the High Velocity Hurricane Zone?

No. Palm Beach County is not in the High Velocity Hurricane Zone, which covers Miami-Dade and Broward counties only. A roof in Juno Beach follows the standard Florida Building Code and needs a statewide product approval number, not a Miami-Dade Notice of Acceptance. Your permit application should list the approval number for the roofing product. Ask the Town of Juno Beach building office to confirm what it needs on the application.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: New construction roofing

Do new Juno Beach homes need gutters?

Where eaves project less than 6 inches, a building must have gutters with downspouts, though gable end rakes and any roof sitting above another roof are exempt. The code also sets how far water must be carried from the wall, at 1 foot minimum. Juno Beach's median home dates to 1989, so many neighbors have older gutter setups, but a new build follows the current residential code on this point.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

What is the 25 percent rule for a Juno Beach roof?

If more than 25 percent of a roof section is repaired or replaced in any 12-month period, the whole section must be brought to current code. The exception covers a roof that was itself built, repaired or replaced to the 2007 Florida Building Code or later, which applies to the work done on it. About 16.5 percent of Juno Beach homes date to 2010 or later, so some roofs may qualify for that exception.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Juno Beach

Sources for this page(39)
  1. 1.Permit office: Town of Juno Beach - Building. Town of Juno Beach - Building. Read Oct 10, 2026.
  2. 2.Wikipedia, 'Juno Beach, Florida' (revision 1369944622). Read Oct 5, 2026.
  3. 3.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B01001, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
  8. 8.People (2020 Census): 3,858. U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 26 (Incorporated Places). Read Oct 5, 2026.
  9. 9.Housing units (ACS 5-year): 3,658. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  10. 10.Share of homes built 2010 or later: 16.5%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  11. 11.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  12. 12.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  13. 13.Median year homes were built: 1989. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  14. 14.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  15. 15.Miami-Dade County RER notice. Read Oct 5, 2026.
  16. 16.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  17. 17.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  20. 20.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  21. 21.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  22. 22.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  23. 23.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  24. 24.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  25. 25.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
  26. 26.Town of Juno Beach - Building, Town of Juno Beach. Read Oct 5, 2026.
  27. 27.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  28. 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
  29. 29.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 26 (Incorporated Places), U.S. Census Bureau. Read Oct 5, 2026.
  30. 30.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  31. 31.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  32. 32.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  33. 33.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, B01001, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  34. 34.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  35. 35.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  36. 36.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  37. 37.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  38. 38.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Juno Beach 2020 Census internal point (26.8755, -80.0596), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  39. 39.Fla. Stat. 489.105(3)(e), Florida Legislature. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Juno Beach

Answer a few questions about the job, or call.

CallFree estimate