Commercial roofs · Hypoluxo
Commercial roofing in Hypoluxo, FL
In Hypoluxo, 41.9 percent of homes are in buildings with 10 or more units, so many roofs here belong to associations and property managers. Palm Beach County is outside the High-Velocity Hurricane Zone, so those roofs follow the standard Florida Building Code.
Updated October 2026

Our workBuilding stock
Multi-unit buildings and seasonal occupancy in Hypoluxo
The county figure for buildings of 10 or more units is 25.1 percent. Hypoluxo's 41.9 percent is well above it. That matters because one roof often covers many owners, and a board usually has to approve the work.
Another 31.1 percent of Hypoluxo's housing units are held for seasonal or occasional use, against 9.5 percent countywide. That is about 3.3 times the county share. Many units may sit empty during repairs, which can make it harder to give notice or reach owners about a leak.
The median home here was built in 1990, close to the county's 1986. These buildings are not new, so expect older decks that need inspection before any new membrane goes down.
Code and permits
Code, permits and low-slope drainage rules
The Town of Hypoluxo Building and Zoning office handles roof permits here. Before you sign a contract, check the current submittal steps with that office. The county's Self-Issued Reroof Application is aimed at qualifying residential reroofs, so a multi-unit commercial roof should be confirmed with the building office.
A minimum design slope of one-fourth unit in 12, equal to 2 percent, is required for new low-slope roofs. That requirement covers built-up, modified bitumen, single-ply, spray foam and liquid-applied roof systems alike. Ponding is a drainage failure, so ask each bidder how water leaves the roof.
Where a perimeter wall can trap water, the code calls for secondary overflow drains or scuppers. Storm drains are sized from the 100-year hourly rainfall rate. West Palm Beach Airport averages 61.75 inches of rain a year, so check that the drain count fits your roof.
Bid comparison
Comparing bids on a Hypoluxo commercial roof
- Written scope that states tear-off or recover, and why, under the code's recover limits.
- Look for the membrane standard written into the bid, for example ASTM D6878 for TPO or D4637 for EPDM.
- Edge metal tested to ANSI/SPRI ES-1 or RAS 111, as the code requires on low-slope roofs.
- Drain, scupper and slope plan, plus who pulls the permit.
- Record and post a Notice of Commencement before the first inspection takes place.
A general contractor must subcontract roofing work unless he or she holds a state roofing certificate or registration. Ask who will actually do the roofing, and check that license in the state database.
Questions
Commercial roofing in Hypoluxo: questions
Is Hypoluxo in the High-Velocity Hurricane Zone?
The High-Velocity Hurricane Zone covers just two counties, Miami-Dade and Broward, so projects elsewhere fall outside it. The standard Florida Building Code applies in Palm Beach County, and that includes Hypoluxo. That means the HVHZ uniform roofing permit application and its extra inspection stages do not apply to your roof. Local permits still apply, so confirm the exact submittal steps with the Town of Hypoluxo Building and Zoning office.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
What is the 25% roof rule in Florida?
If more than 25 percent of a roof section is repaired, replaced or recovered in a 12-month period, the whole section must be brought up to current code. A roof qualifies for the exception when it was built, repaired or replaced under the 2007 Florida Building Code or later. On Hypoluxo's older multi-unit buildings, ask your roofer to document which rule applies before work begins.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
What slope does a new flat commercial roof need in Palm Beach County?
The code sets a minimum design slope of one-fourth unit in 12, or 2 percent, for new low-slope roofs. Built-up, modified bitumen, single-ply, spray foam and liquid-applied systems are all included. With West Palm Beach Airport averaging 61.75 inches of rain a year, drainage should be on every bid. Also ask how the design clears water within 48 hours of rain.
Source: FBC-B 2023 Ch. 15, read Oct 5, 2026
Can a new commercial roof go over the old one?
Sometimes, but not always. The code bars a recover and requires tear-off to the deck if the old roof is water soaked, has two or more existing coverings, or has blisters that are not cut and secured. Hypoluxo's median home was built in 1990, so some older buildings may already be layered. Have the deck inspected before you accept a recover bid.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Sources for this page(31)
- 1.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 3.Share of homes in buildings with 10+ units: 41.9%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, B01001, via Census Reporter API. Read Oct 5, 2026.
- 6.Seasonal, recreational or occasional-use homes (share of all units): 31.1%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, via Census Reporter API. Read Oct 5, 2026.
- 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 8.Permit office: Town of Hypoluxo - Building and Zoning. Town of Hypoluxo - Building and Zoning. Read Oct 10, 2026.
- 9.Palm Beach County PZB - Building Division, Self-Issued Reroof Applications. Read Oct 5, 2026.
- 10.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service). Read Oct 5, 2026.
- 11.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 12.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
- 13.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 14.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.FBC-B 2023 Ch. 15. Read Oct 5, 2026.
- 16.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 18.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 19.Town of Hypoluxo - Building and Zoning, Town of Hypoluxo. Read Oct 5, 2026.
- 20.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 21.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 22.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 24.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
- 25.Miami-Dade County RER notice, Miami. Read Oct 5, 2026.
- 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 27.Wikipedia, 'Hypoluxo, Florida' (revision 1375548907), Wikipedia. Read Oct 5, 2026.
- 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Hypoluxo 2020 Census internal point (26.5685, -80.0518), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 26 (Incorporated Places), U.S. Census Bureau. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Hypoluxo 2020 Census internal point (26.5685, -80.0518), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
South Fork Roofing
Commercial roofing in Hypoluxo
Answer a few questions about the job, or call.
