Skip to content

New construction · Lazy Lake

New construction roofing in Lazy Lake, FL

Lazy Lake has a 0 percent share of homes built in 2010 or later, by Census estimates, so a new roof here usually means a rebuild on an old lot. Any new build still faces Broward's High Velocity Hurricane Zone rules. Applications filed from December 31, 2026 forward are reviewed under the Ninth Edition of the Florida Building Code.

Updated October 2026

A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.

Lazy Lake figures this page uses

Median year homes were built
1958
People (2020 Census)
33
Share of homes built 2010 or later
0%
Housing units (ACS 5-year)
24

Local housing

Why new roofs are uncommon in Lazy Lake

Census estimates put the median home here at 1958, against 1980 for Broward County. Every housing unit is a single-family detached home. The village counts 33 people in 2020 and sits inside Wilton Manors, so new building is mostly a rebuild on an existing lot.

More than half of residents are 65 or older, compared with 17.9% across Broward. County builders pulled permits for 712 single-family units in 2025 against 1,431 in 2020, so county activity has slowed, though none of it points to a boom in this village.

Code rules

Product approval, deck slope and underlayment for a Broward roof

Only Broward and Miami-Dade sit in the High Velocity Hurricane Zone, so Lazy Lake builders work under its stricter roofing provisions. A new roof here must use products with statewide approval, and the HVHZ permit application lists the product approval or Miami-Dade Notice of Acceptance numbers. On new low-slope work, the deck slope can be no flatter than 1/4:12, and loose-laid systems are not allowed.

Under the Florida Building Code, roof sheathing is nailed with ring shank nails. Shingle, metal and similar roofs then need one of three dry-in methods: fully self-adhering underlayment, tape or membrane over every deck joint plus approved underlayment, or two layers of felt underlayment fastened at 12 inches in the field.

Inspections

Timing the roof around the building schedule

On a new Lazy Lake home, the roofing inspection comes after framing, sheathing and exterior wall coverings and before the final. Inspectors look at dry-in, insulation, coverings and flashing. A permit goes invalid if no work starts within 6 months of issue or if work stops for 6 months.

Have the Notice of Commencement recorded and posted at the site ahead of the first inspection. The permit card carries a warning that leaving it out could cost an owner double. Confirm current Lazy Lake permit steps with the village permitting page, which links Broward County code documents.

Questions

New construction roofing in Lazy Lake: questions

Which Florida Building Code edition applies to a new roof in Lazy Lake?

The edition in force since December 31, 2023 is the Eighth, and the Ninth takes over on December 31, 2026, for any permit application or plans submitted on or after that date. Lazy Lake sits in Broward, so the HVHZ provisions come with either edition. Confirm which edition covers your filing date with the village permitting office or Broward County's Building Code Division.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: New construction roofing

What is the 25% roof rule in Florida?

It covers existing roofs, not new builds. Repairing, replacing or recovering more than a quarter of a roof section in a 12-month span means the whole section must be redone to current code. A carve-out exists for roofs already built or redone under the 2007 Florida Building Code or later. With a median home year of 1958 in Lazy Lake, ask the building office how this applies to your roof.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: New construction roofing

Does a new home in Lazy Lake come with a builder warranty?

Florida Statute 553.837, in effect since July 1, 2025, makes a builder cover a newly built home for 1 year after conveyance of title or initial occupancy, whichever comes first, for defects in equipment, material or workmanship that are a material Florida Building Code violation. The coverage leaves out normal wear, settling, damage the owner causes and natural disasters. Read your contract for the exact terms.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Do new Lazy Lake homes need gutters?

Gutters with downspouts are required whenever the eaves project less than 6 inches, but you can skip them along gable end rakes and on any roof that sits above another roof. You need to point every downspout so it discharges at least 1 foot from the sidewall. All 24 housing units here are estimated to be single-family detached homes, so this applies to each house design individually.

Source: 2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7, read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Lazy Lake

Sources for this page(37)
  1. 1.Median year homes were built: 1958. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  4. 4.People (2020 Census): 33. U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 26 (Incorporated Places). Read Oct 5, 2026.
  5. 5.Wikipedia, 'Lazy Lake, Florida' (revision 1373303820). Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B01001, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Permit office: Village of Lazy Lake - Permitting Information (village page; links Broward County code documents). Village of Lazy Lake - Permitting Information (village page; links Broward County code documents). Read Oct 10, 2026.
  8. 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  9. 9.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, B01001, via Census Reporter API. Read Oct 5, 2026.
  11. 11.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  12. 12.Broward County, Building Code Division. Read Oct 5, 2026.
  13. 13.Share of homes built 2010 or later: 0%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  14. 14.Housing units (ACS 5-year): 24. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  15. 15.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  16. 16.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  21. 21.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  22. 22.Miami-Dade County RER notice. Read Oct 5, 2026.
  23. 23.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  24. 24.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  25. 25.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
  26. 26.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  27. 27.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 26 (Incorporated Places), U.S. Census Bureau. Read Oct 5, 2026.
  28. 28.Village of Lazy Lake - Permitting Information (village page; links Broward County code documents), Village of Lazy Lake. Read Oct 5, 2026.
  29. 29.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  30. 30.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  31. 31.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  32. 32.Florida Building Commission, Florida Building Commission. Read Oct 5, 2026.
  33. 33.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  34. 34.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  35. 35.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  36. 36.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  37. 37.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Lazy Lake 2020 Census internal point (26.1563, -80.1452), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Lazy Lake

Answer a few questions about the job, or call.

CallFree estimate