Re-roofs · Melbourne Village
Roof replacement in Melbourne Village, FL
In Melbourne Village, 78.6 percent of homes were built before 1980. That suggests many original roofs here have already been replaced at least once, and some may be due again. A replacement is not a quick swap. It needs a town permit, inspections and decisions about the deck underneath.
Updated October 2026

Our workMelbourne Village figures this page uses
- Median year homes were built
- 1963
- Share of homes built 2010 or later
- 3.1%
- Share of homes built before 1980
- 78.6%
- Owner-occupied share of occupied homes
- 89%
Housing age
Older homes and what is under your shingles
The median year built here is 1963, with a margin of error of 4 years. Only 3.1 percent of homes date from 2010 or later. By our arithmetic, that leaves roughly 18 percent of homes built between 1980 and 2009. Older construction means you should expect the deck to be inspected once the old covering comes off.
Your neighbors are mostly owners. Owner-occupied homes make up 89 percent of occupied housing, and 96.1 percent of units are single-family detached. There are no mobile homes counted here, so the Florida Building Code roof rules apply to essentially every house in town.
Brevard County's median build year is 1988, 25 years later than ours. Storm history matters too. Hurricane Irma damaged over 7,132 county homes in 2017, with roof and shingle damage common. Roofs that were patched after that storm are worth a close look before the next one.
Permit steps
The permit, the inspections and who issues them
The Town of Melbourne Village states that roofing is not exempt from permits under HB 803. A permit is valid for one year and takes about 7 days to review. Nearby West Melbourne also requires a roofing permit regardless of value. Confirm current steps with the Melbourne Village permit office before work starts.
Florida law lets only a roofing contractor, or a general contractor who subcontracts the roofing, do this work. Required roof-deck attachment and any rotted sheathing repair fall inside the roofing scope. That is why a tear-off and deck check belong in the same job.
Before the first inspection, you need to have a Notice of Commencement recorded and posted at the job site. According to the permit card, leaving it out can leave you paying a second time for the same improvements. Ask your contractor to show you the recorded notice before the first inspection.
25% rule
The 25 percent rule and older roofs
If you repair or replace more than 25 percent of a roof in 12 months, the whole roof section must be brought to current code. An exception applies only when the existing roof itself was built, repaired or replaced to the 2007 Florida Building Code or later. A 1963 house does not qualify on its own age.
Questions
Roof replacement in Melbourne Village: questions
Do I need a permit to replace my roof in Melbourne Village?
Yes. The Town of Melbourne Village states that roofing is not exempt from permits under HB 803. Its permit page says a permit is valid for one year and takes about 7 days to review. Florida's code also lets a permit lapse if work does not start within 6 months. Call the town permit office to confirm current forms before you sign a contract.
Source: Town of Melbourne Village, Permits, read Oct 5, 2026
What is the 25 percent roof rule in Florida?
Whenever more than 25 percent of a roof section gets repaired or replaced within any 12-month period, current code requires replacing the whole section. The exception is for a roof that already met the 2007 Florida Building Code or later. For a Melbourne Village house, where 78.6 percent of homes predate 1980, you should not assume the exception applies.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, read Oct 5, 2026
My roof is over 15 years old. Can my insurer force me to replace it?
For a roof that is 15 years or older, Florida Statute 627.7011(5) requires the insurer to allow you to have an authorized inspector examine it, with you covering the cost. Where the inspection finds 5 or more years of useful life remaining, the insurer cannot refuse coverage or decline to renew based only on the roof's age. Policy terms differ, so bring your declarations page to your agent. With 89 percent owner-occupied homes here, many Melbourne Village owners may face this question.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, read Oct 5, 2026
Where can I check my address wind speed before choosing a roof?
For permitting purposes, Brevard County posts building-code wind speed maps by risk category, down to the individual address. The design wind speed sorts a home into a wind region, and that affects how the roof must be built. Look up your own address there, and ask the Melbourne Village permit office to confirm which edition of the code applies to your permit.
Source: Brevard County, Building Code Wind Speed Maps, read Oct 5, 2026
Nearby
Roof replacement near Melbourne Village
Sources for this page(33)
- 1.Median year homes were built: 1963. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 2.Share of homes built 2010 or later: 3.1%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 3.Share of homes built before 1980: 78.6%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 6.Owner-occupied share of occupied homes: 89%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 7.Single-family detached share of housing units: 96.1%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 8.Mobile homes, share of housing units: 0%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 9.Hurricane Irma (2017). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017). Read Oct 5, 2026.
- 10.Brevard County, Building Code Wind Speed Maps. Read Oct 5, 2026.
- 11.Town of Melbourne Village, Permits. Read Oct 5, 2026.
- 12.Permit office: Town of Melbourne Village Permits. Town of Melbourne Village Permits. Read Oct 10, 2026.
- 13.City of West Melbourne, Building Department. Read Oct 5, 2026.
- 14.Florida Statutes, section 553.73 (2026). Read Oct 4, 2026.
- 15.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
- 17.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
- 20.Miami-Dade County RER notice. Read Oct 5, 2026.
- 21.Florida Statutes, section 627.7011 (2026). Read Oct 5, 2026.
- 22.OIR form. Read Oct 4, 2026.
- 23.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 24.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 25.Town of Melbourne Village Permits, Town of Melbourne Village Permits. Read Oct 5, 2026.
- 26.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 27.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
- 28.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 29.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Melbourne Village 2020 Census internal point (28.0880, -80.6651), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Melbourne Village 2020 Census internal point (28.0880, -80.6651), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 32.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 33.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
South Fork Roofing
Roof replacement in Melbourne Village
Answer a few questions about the job, or call.
