Commercial roofs · Longwood
Commercial roofing in Longwood, FL
Longwood has about 6,757 housing units, so much of its commercial roofing work sits on apartments, condo buildings and association property rather than big-box retail. Those buildings usually have flat or low-slope roofs. The City of Longwood Permitting and Inspections office issues the roof permit, and Seminole County follows the standard Florida Building Code, not the High-Velocity Hurricane Zone.
Updated October 2026

Our workBuilding stock
Longwood Buildings and the Code That Governs Them
The median Longwood home was built in 1983, against 1988 countywide, while 19.2 percent of units date from 2010 or later. That mix suggests newer multi-unit buildings sit beside older ones, so roof ages and systems will differ from one property to the next. Get each roof looked at on its own.
Longwood calls itself the oldest city in Seminole County and keeps a designated Historic District. If your building sits in or near it, ask the permit office before work starts whether any district review applies. The city is the authority to confirm that with.
The stricter Miami-Dade and Broward product rules do not apply here. Seminole County works under the statewide code, and the Ninth Edition applies to permit applications filed on or after December 31, 2026. Check which edition your application will fall under.
Flat roof basics
Seminole County Rain and Your Low-Slope Roof
Modified bitumen, built-up, single-ply and foam roofs all need a minimum design slope of one-fourth unit in 12 on new work. Single-ply TPO sits under the same Florida section as other membranes. Ask any bidder which system and which standard they are quoting.
Seminole County averages about 54 inches of rain a year at Sanford, with 45 percent falling from June through August. Florida defines positive drainage as water clearing the roof within 48 hours. Where parapets could trap water, the code also calls for overflow drains or scuppers.
A recover over an old roof is barred if the existing roof is water soaked or already carries two or more coverings. In those situations the old roofing has to come off all the way down to the deck. Ask for the moisture and layer findings in writing before you accept a recover bid.
Bids and permits
How to Compare Bids, Permits and the 25 Percent Rule
Not more than 25 percent of a roof section may be repaired or replaced in any 12-month period before the whole section must be brought up to current code. The exception covers only roofs built or redone to the 2007 code or later. Ask the permit office how it counts a partial reroof on your building.
When you compare bids, line up the same items: system type, deck repair, drainage, edge metal, and who pulls the permit. Roof-deck attachment and sheathing repair fall inside the roofing contractor's scope under Florida law. Check the contractor's license with the state before you put your signature on any paperwork.
Condo and association boards should also confirm the Notice of Commencement is recorded and posted before the first inspection. According to the permit card, skipping the permit could leave you paying for the work twice.
Questions
Commercial roofing in Longwood: questions
What is the 25% roof rule in Florida?
Whenever repairs, replacement or recovering touch more than 25 percent of a roof section within any 12-month period, current code requires you to replace or recover that entire section. A roof built or redone under the 2007 Florida Building Code or later gets an exception, and the repair alone must meet current code. Confirm how it applies to your Longwood building with City of Longwood Permitting and Inspections.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Who issues a commercial roof permit in Longwood?
The City of Longwood Permitting and Inspections office handles roof permits. Longwood has 6,757 housing units, so many multi-unit and association roofs go through that same office. Confirm current application steps, inspection timing and any Historic District review with the building office before work begins. A permit also lapses when the work has not begun within 6 months.
Source: City of Longwood Permitting and Inspections, read Oct 5, 2026
Does the High-Velocity Hurricane Zone apply to Longwood roofs?
Not in Seminole County. That zone is limited to Broward and Miami-Dade, and Longwood follows the statewide Florida Building Code. Hurricane Irma still tested the area in 2017, with a peak gust of 65 knots at Orlando-Sanford, so wind uplift and edge-metal requirements in Chapter 15 and 16 still matter for your design.
Source: FBC-Building 2023 Chapter 2 definitions, read Oct 5, 2026
Can my flat commercial roof be recovered instead of torn off?
Sometimes, but not always. A recover is barred where the existing roof is water soaked, has two or more coverings already, or cannot meet the code's securement rules. With a median Longwood build year of 1983, some older flat roofs may have prior layers. Ask the contractor for a written finding on moisture and layer count before agreeing to a recover.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Nearby
Commercial roofing near Longwood
Sources for this page(31)
- 1.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 4.City of Longwood, Historic District. Read Oct 5, 2026.
- 5.Permit office: City of Longwood Permitting and Inspections. City of Longwood Permitting and Inspections. Read Oct 10, 2026.
- 6.Seminole County Government, Building Division. Read Oct 5, 2026.
- 7.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API. Read Oct 5, 2026.
- 8.Housing units (ACS 5-year): 6,757. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 9.Hurricane Irma (2017). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017). Read Oct 5, 2026.
- 10.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.FBC-B 2023 Ch. 15. Read Oct 5, 2026.
- 13.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 14.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
- 16.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 17.Florida Statutes, section 718.112 (2026). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.City of Longwood Permitting and Inspections, City of Longwood Permitting and Inspections. Read Oct 5, 2026.
- 20.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 21.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 22.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 23.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 24.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
- 25.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 26.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
- 27.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Ian (2022), National Weather Service. Read Oct 5, 2026.
- 28.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
- 29.NWS Melbourne, Lightning Information Center, National Weather Service. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Longwood 2020 Census internal point (28.7014, -81.3484), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Longwood 2020 Census internal point (28.7014, -81.3484), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
South Fork Roofing
Commercial roofing in Longwood
Answer a few questions about the job, or call.
