Skip to content

Commercial roofs ยท Progress Village

Commercial roofing in Progress Village, FL

In Progress Village, 10.4 percent of homes sit in buildings with five or more units, according to the 2024 American Community Survey. As a result, roofs spanning several units make up a big portion of our local jobs. Property managers and association boards need a clear way to compare bids before signing anything.

Updated October 2026

A low-slope roof section covered in a granulated cap sheet beside a gray shingle slope, with neighboring rooftops, palms and trees under a pale sky.

Progress Village figures this page uses

People (2020 Census)
11,188
Housing units (ACS 5-year)
4,643
Share of homes in buildings with 5+ units
10.4%

Local building stock

Why multi-unit roofs dominate commercial work here

The county has 4,643 housing units, with a margin of error of plus or minus 423 units, according to the same survey. Many of these are multi-unit buildings, so a single roof job can cover several households at once. The 2020 census counted 11,188 people in the place.

Any building of this kind that is planned for roof work falls under Hillsborough County permitting, because Progress Village is unincorporated. Your permit is handled by the county building office. Call them before work starts to confirm which code edition applies to your job.

Code and drainage

Low-slope systems and drainage rules to check in a bid

Flat or low-slope commercial roofs here must meet a minimum design slope of one-fourth unit in 12, which is 2 percent, for built-up, modified bitumen, single-ply and liquid-applied systems. If a quote leaves out the finished pitch of the roof, ask the contractor about it before signing.

Storm drainage must be sized on the 100-year hourly rainfall rate, and positive drainage should clear water within 48 hours of rain. Tampa International Airport averages 49.48 inches of rain a year, and about 61 percent of it falls June through September, by our arithmetic on the normals.

  • Ask each bidder for the finished slope in writing.
  • Ask where secondary overflow drains or scuppers are planned.
  • Confirm the single-ply or modified bitumen product meets the listed ASTM standard.

Bid comparison

How to compare commercial roofing bids side by side

Ask every bidder to state the same scope: the membrane type, the deck slope, the edge metal and the drainage plan. Bids that name different materials cannot be compared on price alone. Florida's roofing contractor rules also require a bidder to hold the right certification or registration, so check that before you compare numbers.

Questions

Commercial roofing in Progress Village: questions

Do you need a permit for a new roof in Florida?

Yes. Because Progress Village sits outside any city limits, Hillsborough County's building office is the agency that grants the permit. Roof work on a commercial building, including repair or replacement, falls under the Florida Building Code. Florida's 2023 code edition came into force on the last day of 2023. Call the county office before you sign a contract so you know which edition and requirements apply to your building.

Source: Hillsborough County - Building Permits & Records (unincorporated Hillsborough County), read Oct 5, 2026

Related: Commercial roofing

How many housing units are in Progress Village?

The 2024 American Community Survey estimates 4,643 housing units in the place, with a margin of error of plus or minus 423 units. About 10.4 percent of homes are in buildings with five or more units. These figures help explain why multi-unit roof bids are common here.

Source: U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026

Related: Commercial roofing

What slope should a flat commercial roof have in Florida?

The minimum design slope for new low-slope roofs is one-fourth unit in 12, which is 2 percent, for most systems. Built-up coal-tar roofs use a lower minimum. Water covers 6.9% of the place's total area, so heavy rain and drainage matter for flat roofs here. Ask every bidder to state the finished slope in writing so you can compare their drainage plans fairly.

Source: FBC-B 2023 Ch. 15, read Oct 5, 2026

Related: Commercial roofing

Nearby

Commercial roofing near Progress Village

Sources for this page(29)
  1. 1.People (2020 Census): 11,188. U.S. Census Bureau, 2020 Census (POP100) via TIGERweb tigerWMS_Census2020. Read Oct 5, 2026.
  2. 2.Housing units (ACS 5-year): 4,643. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Share of homes in buildings with 5+ units: 10.4%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  4. 4.NOAA NCEI U.S. Climate Normals 1991-2020, station USW00012842 TAMPA INTL AP. Read Oct 5, 2026.
  5. 5.Wikipedia (Riverview, Brandon); U.S. Census Bureau ACS 2020-2024 table B25034. Read Oct 5, 2026.
  6. 6.Permit office: Hillsborough County - Building Permits & Records (unincorporated Hillsborough County). Hillsborough County - Building Permits & Records (unincorporated Hillsborough County). Read Oct 10, 2026.
  7. 7.City of Tampa; City of Temple Terrace (official). Read Oct 5, 2026.
  8. 8.U.S. Census Bureau, Census 2020 place geography (AREALAND/AREAWATER) via TIGERweb tigerWMS_Census2020. Read Oct 5, 2026.
  9. 9.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  10. 10.FBC-B 2023 Ch. 15. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-14 (the research cites it "as C-14").
  11. 11.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from COM-20 (the research cites it "as COM-20").
  12. 12.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-14 (the research cites it "as C-14").
  13. 13.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
  14. 14.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  15. 15.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-3 (the research cites it "as C-3").
  16. 16.U.S. Census Bureau, 2020 Census (POP100) via TIGERweb tigerWMS_Census2020, U.S. Census Bureau. Read Oct 5, 2026.
  17. 17.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25024, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  18. 18.Hillsborough County - Building Permits & Records (unincorporated Hillsborough County), Hillsborough County. Read Oct 5, 2026.
  19. 19.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  20. 20.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  21. 21.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  22. 22.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Progress Village 2020 Census internal point (27.8856, -82.3643), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  23. 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Eta, NOAA National Hurricane Center. Read Oct 5, 2026.
  24. 24.Wikipedia, "Progress Village, Florida" (secondary source), Wikipedia. Read Oct 5, 2026.
  25. 25.NWS Melbourne, Lightning Facts and Trivia, National Weather Service. Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine, NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma, NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.Wikipedia articles for each place (secondary), Wikipedia. Read Oct 5, 2026.
  29. 29.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Progress Village 2020 Census internal point (27.8856, -82.3643), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.

South Fork Roofing

Commercial roofing in Progress Village

Answer a few questions about the job, or call.

CallGet a quote