New construction · Dania Beach
New construction roofing in Dania Beach, FL
Only 7.6 percent of Dania Beach homes were built in 2010 or later, so a new roof here is a rare job in an older town. Broward sits in the High-Velocity Hurricane Zone, and that sets deck, underlayment and product rules before the first shingle goes on.
Updated October 2026

Our workCode edition
Code edition that governs a newly built roof in Dania Beach
The median Dania Beach home dates to 1977, and Broward County's median is 1980. New roofs here are built to a very different standard than that older stock. December 31, 2023 is the date the 2023 Florida Building Code took effect. Permit applications submitted on or after December 31, 2026 fall under the Ninth Edition instead.
Two counties make up the High-Velocity Hurricane Zone, and Broward is among them. Roofing products must carry statewide approval, and in this zone the permit application lists the product approval or Miami-Dade Notice of Acceptance numbers. Ask your builder for those numbers before you sign off on the roof material.
The City of Dania Beach Building Division handles permits for roofs in this area. Broward County's Building Code Division handles only unincorporated areas and cities that contract with it, so confirm with the city office which one reviews your plans.
Roof assembly
What a new build needs for deck, underlayment and drip edge
Roof sheathing on a new home is nailed with ring shank nails measuring 2 1/2 inches by 0.131 inch, under the residential code. The dry-in comes next. The code allows three routes: a fully self-adhered membrane, a membrane or tape strip of at least 3 3/4 inches over every deck joint plus underlayment, or two layers of felt-type underlayment nailed with caps.
Along eaves and gables, you lay the shingle drip edge over the top of the underlayment. Fasteners may be 12 inches apart, tightening to 4 inches apart at 110 mph design wind or above, or when the mean roof height passes 33 feet. Tile goes over solid sheathing and follows the Florida High Wind tile manual, Seventh Edition.
- If your eaves stick out less than 6 inches, gutters with downspouts are required.
- You must direct every downspout to discharge no closer than 1 foot from the sidewall.
- Soffit panels must be fastened at the wall and the fascia.
Build sequence
Scheduling the roof with the inspections
Inspections follow the order the code sets out: foundation, framing, sheathing, exterior wall coverings, roofing, and finally the final inspection. In Broward's wind zone, the roofing stage is where the inspector looks at dry-in, insulation, coverings and flashing. Your roofer cannot cover the deck until the sheathing inspection passes, so the crew's start date depends on the framing and sheathing sign-offs.
A builder putting up their own new building is allowed to install the asphalt shingles on it personally. Tile, metal and membrane roofing calls for a certified or registered roofing contractor, so you hire one. A Notice of Commencement must be recorded and posted before the first inspection, and permits lapse after 6 months without work or an approved inspection.
Mobile homes make up 12.4 percent of Dania Beach housing, against 2.6 percent countywide. A new site-built roof follows the Florida Building Code. A manufactured home follows the HUD code, so ask the building office which applies.
Questions
New construction roofing in Dania Beach: questions
Does the 25 percent roof rule apply to a brand-new Dania Beach roof?
No. The 25 percent rule says not more than 25 percent of the total roof area or roof section of an existing building may be repaired, replaced or recovered in any 12-month period unless the roof covering on the entire existing roof system or roof section is replaced or recovered. A brand-new roof has no existing roof to measure against. It matters later: a roof built, repaired or replaced in compliance with the 2007 Florida Building Code or any later edition qualifies for the exception, so only the repaired part must meet current code. Dania Beach's median home dates to 1977, but that describes homes, so each roof must be judged by when it was built, repaired or replaced.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026
Who pulls the roof permit for new construction in Dania Beach?
The City of Dania Beach Building Division handles permits for roofs in this area. In Broward's High-Velocity Hurricane Zone, the application lists the product approval or Notice of Acceptance numbers for the roofing. Confirm current forms with the building office. An owner or the owner's contractor may also choose a private provider for plans review or inspections under Fla. Stat. 553.791.
Source: City of Dania Beach - Building Division, read Oct 5, 2026
What does the Florida builder warranty cover on a new roof?
Since July 1, 2025, Fla. Stat. 553.837 requires a builder to cover a newly built home for 1 year against defects in equipment, material or workmanship that cause a material violation of the Florida Building Code. The year runs from conveyance of title or first occupancy, whichever comes first. Damage from a natural disaster, owner-caused defects and normal wear are left out, so a Dania Beach buyer should keep the closing date on record.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Will the 2026 Florida Building Code change my Dania Beach roof permit?
It can. From December 31, 2026 the Ninth Edition takes effect, and any permit application submitted on or after that date has to meet it. Applications filed earlier fall under the 2023 edition. Because Broward is in the High-Velocity Hurricane Zone, ask the Dania Beach Building Division how the new edition affects your roofing product approvals before you file.
Source: City of Dania Beach - Building Division, read Oct 5, 2026
Sources for this page(36)
- 1.Median year homes were built: 1977. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.NWS Miami, 'Fort Lauderdale Extreme Rainfall and Flooding - April 12th, 2023' StoryMap. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 6.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 7.Permit office: City of Dania Beach - Building Division. City of Dania Beach - Building Division. Read Oct 10, 2026.
- 8.Broward County, Building Code Division. Read Oct 5, 2026.
- 9.Share of homes built 2010 or later: 7.6%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 10.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 11.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 12.Miami-Dade County RER notice. Read Oct 5, 2026.
- 13.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 14.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.FEMA. Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 21.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 22.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 23.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 24.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 25.City of Dania Beach - Building Division, City of Dania Beach. Read Oct 5, 2026.
- 26.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 27.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.Official website: City of Dania Beach, Historic Properties, Official website. Read Oct 5, 2026.
- 30.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 31.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 32.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 33.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 34.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Dania Beach 2020 Census internal point (26.0543, -80.1647), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 35.Wikipedia, 'Dania Beach, Florida' (revision 1378562719), Wikipedia. Read Oct 5, 2026.
- 36.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Dania Beach
Answer a few questions about the job, or call.
