Re-roofs · The Acreage
Roof replacement in The Acreage, FL
Only 6.9 percent of homes in The Acreage were built before 1980, so this is mostly newer housing than the rest of Palm Beach County. Your roof is probably not original to a 1970s house. Replacing it still needs a permit from the county, and the code sets rules about how much you can redo.
Updated October 2026

The Acreage figures this page uses
- Median year homes were built
- 1996
- Share of homes built 2010 or later
- 8.6%
- Single-family detached share of housing units
- 95.2%
- Owner-occupied share of occupied homes
- 92.7%
Home age
Home age and the roof on your Acreage house
Half the homes here went up by 1996, ten years later than the 1986 county midpoint. Homes built from 2010 on make up 8.6 percent of the stock, compared with 9.2 percent countywide. Those numbers describe homes, not roofs, so they tell you nothing certain about the age of yours.
Many of these homes are single-family detached, 95.2 percent of units, and 92.7 percent are owner-occupied. That means the person reading a roofing contract is usually the person paying for it. Read the notices in it before you sign.
Hurricane Milton's EF-3 tornado crossed The Acreage on October 9, 2024, and strengthened near Northlake Boulevard at the north end. If your roof was already worn before that storm, have it looked at by a roofer you chose, not one who knocked on your door.
Permit steps
Permit, inspections and who issues them here
The Acreage is unincorporated, so the Palm Beach County Building Division issues your roof permit, not a city. The High Velocity Hurricane Zone rules cover only Miami-Dade and Broward, so your job follows the standard Florida Building Code.
Before the first inspection, the notice you record with the county must also be posted at the job. The permit card carries a warning about paying twice if that step is skipped. Your permit lapses if nothing starts in the first 6 months, and a 180-day gap with no approved inspection can void it as well.
The new code edition takes effect December 31, 2026. An application submitted on or after that date must follow the new edition. The 2023 edition applies until then.
Code limits
The 25% rule and your existing roof
If you redo more than 25 percent of a roof section within 12 months, the whole section must be replaced. Your house is exempt only if its roof was itself built or redone to the 2007 code or later, and even then the new work must meet current code. Ask the county Building Division which case fits your house.
A roofing contractor's scope includes the roof-deck attachment and any needed repair of wood sheathing. Ask who is responsible for deck nailing and the secondary water barrier, and ask for it in writing.
Insurance is a separate matter from the code. If your roof is 15 years or older, state law lets you pay an authorized inspector to check it before your insurer demands a replacement. With 24.8 percent of Palm Beach County residents 65 or older, many policyholders face that question. Your agent can explain what your own policy requires.
Questions
Roof replacement in The Acreage: questions
What is the 25% roof rule in Florida?
Florida code caps repair or replacement at 25 percent of a roof section in any 12-month period. Once you exceed that limit, the entire section has to be redone. A roof already built or redone to the 2007 code or later is treated differently, since only the new work must meet current standards. With only 6.9 percent of The Acreage homes built before 1980, ask the county Building Division how this applies to yours.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Who issues a roof permit in The Acreage?
The Palm Beach County Planning, Zoning & Building Division issues roof permits here. The Acreage is an unincorporated area, so there is no city building office. Confirm current steps and fees with that office before work starts. Your roofer should pull the permit, and you should see it before the first day of work.
Source: Palm Beach County Planning, Zoning & Building - Building Division, read Oct 5, 2026
How can I tell if a roofer is lying?
Check the contract for the notices Fla. Stat. 489.147 requires, including the bold notice to check coverage with your insurer before signing. A roofer should not offer you anything of value for an inspection or claim. Be wary of any product sold as hurricane protection that lacks Florida product approval. Since Hurricane Milton's tornado crossed The Acreage in 2024, door-to-door offers are common. Verify the contractor's license before you sign.
Source: NWS Miami, 'Hurricane Milton' StoryMap (Oct 9, 2024 tornado outbreak; preliminary data), read Oct 5, 2026
How long is my Acreage roof permit good for?
Your permit expires when 6 months pass without work starting, and it also expires when work sits idle for 6 months. Progress counts when an approved inspection has happened within 180 days. Palm Beach County issues permits for The Acreage, so ask its Building Division about extensions before yours runs out.
Source: Palm Beach County Planning, Zoning & Building - Building Division, read Oct 5, 2026
Sources for this page(34)
- 1.Median year homes were built: 1996. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.Share of homes built 2010 or later: 8.6%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.Single-family detached share of housing units: 95.2%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 6.Owner-occupied share of occupied homes: 92.7% (12,236 of 13,197). U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
- 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 8.NWS Miami, 'Hurricane Milton' StoryMap (Oct 9, 2024 tornado outbreak; preliminary data). Read Oct 5, 2026.
- 9.Permit office: Palm Beach County Planning, Zoning & Building - Building Division. Palm Beach County Planning, Zoning & Building - Building Division. Read Oct 10, 2026.
- 10.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 11.Wikipedia, 'The Acreage, Florida' (revision 1376961744). Read Oct 5, 2026.
- 12.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
- 13.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, B01001, via Census Reporter API. Read Oct 5, 2026.
- 14.Share of homes built before 1980: 6.9%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 15.Florida Statutes, section 489.147 (2026). Read Oct 4, 2026.
- 16.Florida Statutes, section 553.73 (2026). Read Oct 4, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 19.Miami-Dade County RER notice. Read Oct 5, 2026.
- 20.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 21.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
- 22.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
- 23.Florida Statutes, section 627.7011 (2026). Read Oct 5, 2026.
- 24.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 25.Palm Beach County Planning, Zoning & Building - Building Division, Palm Beach County Planning. Read Oct 5, 2026.
- 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 27.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 30.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at The Acreage 2020 Census internal point (26.7742, -80.2769), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 32.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 33.Florida Statutes, section 489.113 (2026), Florida Legislature. Read Oct 5, 2026.
- 34.Florida Building Commission, Florida Building Commission. Read Oct 5, 2026.
South Fork Roofing
Roof replacement in The Acreage
Answer a few questions about the job, or call.