Commercial roofing in Ojus, FL

In Ojus, 59.5 percent of homes are in buildings with 10 or more units, so most roofs here cover apartments and condos, not houses. That shifts your job toward low-slope systems and drainage. Permits come from Miami-Dade County, and the High-Velocity Hurricane Zone rules govern the work.

Updated October 2026

A low-slope roof section covered in a granulated cap sheet beside a gray shingle slope, with neighboring rooftops, palms and trees under a pale sky.

Building stock

Large buildings and flat roofs in Ojus

The share of units in 10-plus-unit buildings is 59.5 percent here, against 40.2 percent across Miami-Dade County. That suggests a property manager in Ojus is more likely than the county average to be dealing with a membrane roof than with shingles or tile.

Median construction year is 1970, and 78.4 percent of units predate 1980. Many of these buildings were likely designed long before today's code. Ask any bidder to check the deck for water damage first. A recover is barred over a soaked deck, or where two or more roof coverings are already on.

Any new low-slope roof must be built with at least a one-fourth unit in 12 slope. Roofs must also drain within 48 hours of rain, and where parapets could trap water, secondary overflow drains or scuppers are required. Ponding on an older flat roof is a drainage problem to fix, not only a leak to patch.

Code and permits

Permits and the High-Velocity Hurricane Zone

Ojus is unincorporated, so you pull your roof permit through Miami-Dade County Regulatory and Economic Resources. Miami-Dade is one of two counties in the High-Velocity Hurricane Zone, and in that zone every roofing repair or maintenance job needs a permit and a uniform permit application signed by a licensed contractor.

Roofing products here must carry a Miami-Dade Notice of Acceptance, reviewed through the county Product Control Section. A copy must be at the job site for the building official. In this zone no loose-laid ballasted system is allowed, and inspections happen before the membrane attachment is concealed and again at final.

If your building was reroofed in compliance with the 2007 Florida Building Code or later, a repair only has to bring the repaired part up to current code. Otherwise, the 25 percent rule can force a full replacement once more than a quarter of the roof area is repaired in 12 months. The Ninth Edition code applies to applications filed on or after December 31, 2026.

Bid review

Comparing commercial roofing bids

  • The permit applicant is a licensed roofing contractor, since a general contractor may not advertise as one without roofing certification.
  • Every product on the bid has a current Miami-Dade Notice of Acceptance with an unexpired date.
  • The bid states whether the work is a recover or a tear-off, and why.
  • The contractor tells you in writing about any ponding risk and recommends a structural review if needed.
  • A Notice of Commencement is recorded and posted before the first inspection.

Metal panel roofs have their own minimum slopes in this zone. Architectural metal panels need 2:12, and standing seam panels that pass the static water leakage test can go down to 1:12. A bid for metal over a flatter roof should show which test the panel passed.

Questions

Commercial roofing in Ojus: questions

Who permits a commercial roof in Ojus?

Miami-Dade County Regulatory and Economic Resources, Building & Permits, issues roof permits in Ojus because it is an unincorporated census-designated place with no city building office. In the High-Velocity Hurricane Zone, all roofing work, including repair and maintenance, needs a permit. The application must be completed and signed by a licensed contractor and include product approvals and detail drawings.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: Commercial roofing

What is the 25% roof rule for a condo or apartment roof?

Not more than 25 percent of the roof area or roof section may be repaired, replaced or recovered in any 12-month period unless the whole roof system or section is replaced or recovered. You qualify for the exception when the roof was built, repaired or replaced under the 2007 Florida Building Code or a later edition. With 59.5 percent of Ojus homes in buildings of 10 or more units, this affects many associations.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026

Related: Commercial roofing

Can a new commercial roof go over my old one in Ojus?

Sometimes, but not always. A recover is barred where the existing roof is water soaked or deteriorated, where two or more roof coverings are already in place, or where blisters are not cut and secured. In the High-Velocity Hurricane Zone, new roofing also may not go over sheathing that is not fastened to code. Given that 78.4 percent of Ojus homes predate 1980, ask for deck checks in writing.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: Commercial roofing

What should a Miami-Dade product approval show?

A Miami-Dade Notice of Acceptance lists an approval date and an expiration date, and it is not valid after that date. A copy of the entire notice must be available at the job site for the building official. Advertising may use the NOA number with the words Miami-Dade County, Florida, and the expiration date. Roofing systems get reviewed by the Product Control Section at Miami-Dade.

Source: Miami-Dade County RER, Board and Code Administration Division, Product Approval, read Oct 5, 2026

Related: Commercial roofing

Sources for this page(26)
  1. 1.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Share of homes in buildings with 10+ units: 59.5%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  6. 6.Wikipedia, 'Ojus, Florida' (revision 1378006523). Read Oct 5, 2026.
  7. 7.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  8. 8.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  9. 9.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
  10. 10.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  11. 11.FBC-B 2023 Ch. 15. Read Oct 5, 2026.
  12. 12.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  13. 13.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  14. 14.miamidade.gov. Read Oct 5, 2026.
  15. 15.Miami-Dade County RER notice. Read Oct 5, 2026.
  16. 16.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  17. 17.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  18. 18.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  19. 19.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  20. 20.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
  21. 21.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  22. 22.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  23. 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  24. 24.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  25. 25.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Ojus 2020 Census internal point (25.9541, -80.1717), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  26. 26.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Ojus 2020 Census internal point (25.9541, -80.1717), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.